Commissioning
After the construction of a plant, many activities which are comprised in a three steps procedure as shown below, will follow to accomplish the project. TIK-Experts and its partners constitutes this section in order to perform activities in this field.
TIK-Experts and its partners’ commissioning team expertise consists of:
Mechanical Completion that represents the interface between construction and commissioning group activities and includes all interface checks between all systems and subsystems both modular or plant wise. In this stage, TIK-Experts checks the plant to confirm that constructions and installations of equipment, piping, instrumentation, cabling, electrics, telecoms and mechanical components are physically complete and all inspections, testing and documentation requirements have been accomplished.
Pre-Commissioning involves the verification of functional operability of elements within the system, by subjecting them to a set of simulated operational conditions, in order to achieve a state of readiness for commissioning. Pre-commissioning requires the appropriateness of every single equipment and the reconciliation with the relevant applying work-systems used in the major project.
Commissioning consists of checking and testing all functions according to their design parameters in conditions as close as possible to the design conditions, and in bringing them to the status “Ready for Start-Up”.